Clean Rooms Designed to Qualify

We manage the design and construction of clean rooms, and the validation activities around them. You get one team from the first user-needs review to rooms that are commissioned, qualified and handed over.

Talk to an engineer
GRADE A · LAFISO 5 at rest & in op.FILLING · GRADE B+45 PaPREP · GRADE C+30 PaPAL · GRADE D+15 PaWASH · D+15 PaMAL+30TECH AREACNC · AHU, WFI loopCORRIDOR · CNC0 Pa
FIG. 1 · Pressure cascade, aseptic filling suiteΔp ≥ 10-15 Pa between grades
Process

Three Stages, One Team

01

Design

Reviewing the required equipment and utilities, understanding user needs, setting the budget and managing the tender.

02

Construction

Selecting the contractor and managing construction, with the architects, HVAC and electrical teams coordinated as one project.

03

Before Hand-Over

Commissioning and validation of the equipment, the HVAC system and the clean rooms. Validation testing is managed by us and performed by an external contractor.

Reference

EU GMP Clean Room Grades

Airborne particle classification per EU GMP Annex 1 and ISO 14644-1. We design the room and the pressure cascade around the grade each step of your process needs.

GradeAt restIn operationTypical use
AISO 5ISO 5Aseptic filling, open product, LAF zones
BISO 5ISO 7Background for Grade A in aseptic work
CISO 7ISO 8Solution preparation, less critical steps
DISO 8Set by siteComponent handling, airlocks, washing